# Speedata production Spark workload tile

Ledger entry, published Not stated

**The short answer.** Speedata's home page shows customer-result tiles: 62.7x acceleration on production Spark workloads, 37 servers consolidated to 3, and processing time from 90 hours to 8 on the same hardware budget. The customer is not named, and no data size, hardware or method is given.

- **Option tested:** [Speedata](/options/speedata/)
- **Ran by:** Speedata (the maker of the option tested)
- **Published:** Not stated
- **Workload:** Enterprise AI data preprocessing on Spark; customer not named
- **Data size:** Not stated
- **Hardware:** Not stated
- **Result as published:** Speedata's wording: 62.7x acceleration on production Spark workloads; 37 servers consolidated to 3; 90 to 8 hours of processing time
- **Cost result as published:** None published (the tile claims up to 90% lower TCO)
- **Method published:** No

## What the test shows and does not show

Undated and no method published: the page shows no date and no workload description.

The tiles describe enterprise AI data preprocessing, and the home page also cites 52x more performance per dollar than a GPU on an unnamed industry-standard benchmark.

No date is shown, so the publication date is not stated.

## Other Ledger entries for Speedata

- [Speedata APU on TPC-H SF100, Microsoft CoddSpeed paper](/ledger/speedata-apu-tpch-sf100-microsoft-paper/): 2026-06-11, run by Microsoft (paper); numbers read from Speedata's blog

## Sources

- Speedata home page: https://www.speedata.io/ (read 10 Nov 2026)

Last reviewed 10 Nov 2026. Canonical: https://sparkaccelerationcompare.com/ledger/speedata-production-spark-consolidation/
